期刊文献+

随机需求下供应链的资金流与物流次序分析

An Analysis of the Order of Capital Flow and Logistics for a Supply Chain under Demand Uncertainty
下载PDF
导出
摘要 实践中供应链的资金流与物流次序通常会有资金流物流同步、资金流滞后或提前于物流3种情形。本文考虑随机市场需求下由供应商和零售商组成的二级供应链,分析3种资金流物流情形下供应链各成员的库存策略及运营绩效,并判断供应链采取何种资金流物流顺序能获得最大运营绩效。结果表明,当供应商的单位产品单位时间资金收益较大时,资金流提前于物流能使供应链获得最大运营绩效;当供应商的单位产品单位时间资金占用成本较小时,资金流滞后于物流能使供应链获得最大运营绩效。此外,不同资金流物流情形下零售商存在唯一最优目标库存,且在资金流物流同步和资金流提前于物流情形下零售商的最优目标库存一致。 In practice,the order of capital flow and logistics in supply chains usually haves three scenarios—capital flow synchronizes with,lags behind or precedes logistics.A two-echelon supply chain consisting of a supplier and a retailer under stochastic demand is considered,the inventory strategy and operation performance of each member of the supply chain under each scenario is analyzed,determine which scenario of capital flow and logistics the supply chain adopts to obtain the maximum operation performance.The results show when the supplier’s unit product unit time capital gain is relatively large,it is more beneficial for capital flow to precede logistics for the supply chain.When the supplier’s unit product unit time opportunity gain is relatively small,the scenario whereby capital flow lags behind logistics is better for the supply chain.In addition,the retailer has the only optimal target inventory under each scenario,and the retailer’s optimal target inventory is the same when capital flow synchronizes with logistics and capital flow precedes logistics.
作者 陈传营 陈怡 周永务 何欢 CHEN Chuanying;CHEN Yi;ZHOU Yongwu;HE Huan(School of Economics and Management,Dongguan University of Technology,Dongguan 523106,China;School of Business Administration,South China University of Technology,Guangzhou 510640,China)
出处 《工业工程》 北大核心 2022年第6期45-54,共10页 Industrial Engineering Journal
基金 国家自然科学基金资助项目(70771034,70971041) 广东省高校人文社科重点研究基地资助项目(08JDXM63003) 广东省自然科学基金资助项目(10151064101000003)。
关键词 随机需求 资金流 物流 二级供应链 运营绩效 stochastic demand capital flow logistics two-echelon supply chain operation performance
  • 相关文献

参考文献6

二级参考文献111

  • 1杨树,梁樑,董骏峰.延期支付条件下单个生产商多个销售商库存模型[J].系统工程,2007,25(4):9-14. 被引量:21
  • 2文晓巍,左两军.易变质商品库存理论研究综述[J].华南农业大学学报(社会科学版),2007,6(4):46-52. 被引量:10
  • 3Stalk G. Time-the next source of competitive advantage [ J]. Harvard Business Review, 1988, 66 (4) :41 - 51.
  • 4Tersine RJ. Principles of inventory and materials management [J]. New York: North Holland, 1982.
  • 5Tersine RJ, Hummingbird EA. Lead-time reduction: The search for competitive advantage[ J]. International Journal of Operations and Production Management, 1995, 15(2):8 - 18.
  • 6Liao C J, Shyu CH. An analytical determination of lead time with normal demand [ J ]. International Journal of Operations and Production Management, 1991, 11(9):72 -78.
  • 7Ben-Daya M, Raouf A. Inventory models involving lead time as a decision variable [ J ]. Journal of the Operational Research Society, 1994, 45 ( 5 ) :579 - 582.
  • 8Ouyang LY, Yeh NC, Wu KS. Mixture inventory model with backurders and lost sales for variable lead time[ J]. Journal of the Operational Research Society, 1996, 47 (6) :829 - 832.
  • 9Ouyang LY, Wu KS. Mixture inventory model involving variable lead time with a service level constraint [ J ]. Computers and Operations Research, 1997, 24(9) :875 - 882.
  • 10Moon I, Choi S. A note on lead time and distributional assumptions in continuous review inventory models [ J ]. Computers and Operations Research, 1998, 25 ( 11 ) : 1007 - 1012.

共引文献134

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部