期刊文献+

电力提灌工程泵站集水井自动化排水装置分析 被引量:1

Analysis of Automatic Drainage Device for Collector Wells of Electricity Irrigation Project Pumping Stations
下载PDF
导出
摘要 针对泵站集水井自动化排水装置设置方案进行分析,并探讨其可靠性,提出泵站经济运行的措施,提高泵站运行质量和效率,确保泵站安全、可靠运行,以推动电力提灌工程泵站可持续发展。 To analyze the automatic drainage device setting scheme for pumping station catchment wells and discuss its reliability,and propose measures for economic operation of pumping stations to improve the quality and efficiency of pumping station operation and ensure safe and reliable operation of pumping stations,so as to promote the sustainable development of pumping stations in electric power irrigation projects.
作者 刘兴祥 Liu Xingxiang(Mechanical and Electrical Division,Jingtai Chuan Electricity Irrigation and Water Resources Utilization Center,Baiyin Gansu 730400)
出处 《现代工业经济和信息化》 2022年第11期249-251,共3页 Modern Industrial Economy and Informationization
关键词 泵站集水井 电力提灌工程 自动化排水 pumping station catchment wells electric power irrigation project automatic drainage
  • 相关文献

参考文献5

二级参考文献10

共引文献14

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部