期刊文献+

深水导管架的上部组块施工方案的选择 被引量:4

Analysis of Selection of Topside Installation Scheme for the Deep-water Jacket
下载PDF
导出
摘要 考虑目前导管架上部模块的吊装和浮托两种方案,针对不同的上部模块规模和环境条件,结合油田开发投资,对我国首部水深超过250 m的深水导管架上部模块施工方案进行选择分析,从设计和建造、安装两方面进行方案对比分析,确定上部模块施工方案的选择对深水导管架的设计、建造和施工的影响。 For the topside installation of the jacket,lifting and float-over are the two main schemes.According to the different scale,weight and environmental conditions of the topside module,combined with the investment of oilfield development,the suitable installation scheme of the first deep-water jacket topside with water depth over 250 m was selected and analyzed.The scheme was compared and analyzed from two aspects of design and construction,installation,the impact of the installation scheme selection of the topside on the design,fabrication and construction of the deep-water jacket.
作者 邵卫东 付殿福 慈洪生 SHAO Wei-dong;FU Dian-fu;CI Hong-sheng(CNOOC Research Institute,Beijing 100028,China)
出处 《船海工程》 北大核心 2022年第6期72-76,共5页 Ship & Ocean Engineering
基金 中国海洋石油集团有限公司“300米水深级导管架设计及建造关键技术研究”。
关键词 深水导管架 上部组块 吊装 浮托 建造 安装 deep-water jacket topside lifting float-over fabrication installation
  • 相关文献

参考文献10

二级参考文献59

  • 1刘东玉,郭刚,徐兴平.海洋平台浮装就位技术研究[J].中国海洋平台,2004,19(6):50-53. 被引量:7
  • 2房晓明,郝军,魏行超.南堡35-2油田中心平台应用浮托法安装新工艺实践[J].中国海上油气(工程),2006,18(2):126-129. 被引量:24
  • 3徐田甜,董坤,王宁.渤中34-1油田CEPA中心平台生活模块结构设计[J].船舶,2007,18(3):40-45. 被引量:3
  • 4O'Neill L A, Fakas E, Ronalds B F, et al. History, trends and evolution of float - over installation in open waters[C]// Society of Petroleum Engineers Conference. Texas, USA : SPE,2000,: 12-40.
  • 5Michel Seij , Henk de Groot. State of the art in floatovers [C]// Offshore Technology Conference. Houston,USA : OTC, 2007: 19072.
  • 6Tribout C, Emery D, Weber P. Float-overs offshore west africa [C]// Offshore Technology Conference. Houston, USA: OTC, 2007: 19073.
  • 7Jean-Marc Cholley, Anne tank testing and numerical Vanneste. Comparison of analysis for the design of a catamaran for deck installation by the float-over method [C]//Offshore Technology Conference. Houston, USA : OTC, 2009: 19835.
  • 8Arcandra Tahar, John Halkyard, Atle Steen ,et al. Float over installation method comprehensive comparison between numerical and model test results[J]. Journal of Offshore Mechanics and Arctic Engineering. 2006, 128: 257-262.
  • 9API 2A-WSD-2000, Recommended Practice for Planning, Designing and Constructing Fixed Offshore Platforms-Working Stress Design [S].
  • 10ONeill L A,Fakas E,RonaldsBF.History,trends and cvolution of float over deck installation in open waters[C].// SPE Annual Technical Conference and Exhibition,SPE 63037,Texas:Dallas,2000,1-4.

共引文献107