期刊文献+

郑州某地铁车站主体结构模板支架专项施工及安全管理分析 被引量:1

Special Construction and Safety Management Analysis of Formwork Support for Main Structure of a Subway Station in Zhengzhou
下载PDF
导出
摘要 车站主体结构模板支撑体系施工是地铁施工的重要部分,涉及脚手架搭设、混凝土施工、模板施工等内容,安全管理风险较大。文章围绕郑州某地铁车站主体结构模板支架专项施工项目,分析模板支架施工流程与要求,在此基础上分析模板支架体系施工安全管理,对施工中的各类风险进行分析,总结了模板支撑体系施工过程中的安全技术管理措施,以供参考。 The construction of the formwork support system of the station’s main structure is an important part of the subway construction, involving scaffolding erection, concrete construction, formwork construction, etc., and the safety management risk is large. This paper focuses on the special construction project of formwork support for the main structure of a subway station in Zhengzhou, analyzes the construction process and requirements of formwork support. On this basis, it analyzes the construction safety management of formwork support system, analyzes various risks in construction, and summarizes the safety technical management measures in the construction process of formwork support system for reference.
作者 李龙 Li Long(Sinohydro Bureau 11 Co.,Ltd.,Zhengzhou,Henan 450001)
出处 《工程技术研究》 2022年第19期61-63,共3页 Engineering and Technological Research
关键词 地铁车站 模板支撑体系 模板安装 安全管理 subway station formwork support system formwork installation safety management
  • 相关文献

参考文献2

二级参考文献2

共引文献5

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部