期刊文献+

定额取消下依托BIM技术的工程造价管理研究

Research on BIM Technology-Based Project Cost Management inQuotaCancellation Policy
下载PDF
导出
摘要 文章结合现阶段工程造价管理中常见问题,在预算定额取消背景下探讨BIM技术在工程造价管理中的应用及价值。通过定额取消对造价管理的影响和BIM技术在工程造价管理中的运用价值进行论述,通过BIM技术应用实例分析其运用条件,剖明在预算定额取消下依托BIM技术的管理是一种行之有效的工程造价控制方法。 Combined with the common problems in project cost management at the present stage,this paper discusses the application and value of BIM technology in project cost management under the background of budget quota cancellation.The impact of quota cancellation on cost management and the application value of BIM technology in project cost management are discussed,the application conditions of BIM technology are analyzed through the application examples of BIM technology,and it’s concluded that the management relying on BIM technology under the cancellation of budget quotas is an effective project cost control method.
作者 陈冠名 王梦婷 Chen Guan-ming;Wang Meng-ting(Guangzhou Design Institute Group Co.,Ltd.,Guangzhou 510620,Guangdong Province,China;Guangzhou Shizhuo Engineering Cost Consulting Co.,Ltd.,Guangzhou 510620,Guangdong Province,China)
出处 《科学与信息化》 2022年第23期184-186,共3页 Technology and Information
关键词 预算定额取消 BIM技术 工程造价管理 budget quota cancellation BIM technology project cost management
  • 相关文献

参考文献2

二级参考文献8

共引文献212

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部