期刊文献+

预制桥墩连接技术研究综述

Summary of Research on Precast Pier Connection Technology
下载PDF
导出
摘要 预制桥墩体系因具有快速施工、缩短工期等优点而被大量应用于国内外的非强震区。现阶段对预制桥墩体系抗震性能的研究尚不成熟,这限制了其在强震区的工程应用。将预制桥墩体系分成等同现浇连接、非等同现浇连接、UHPC连接和震后可恢复连接四类进行总结。介绍了不同连接形式的基本构造、传力机理和抗震性能,并重点阐述了UHPC连接和震后可恢复连接的相关研究。在此基础上分析并展望了预制桥墩连接技术未来的研究方向,以促进国内实际工程中对预制桥墩连接技术的合理应用。 Prefabricated bridge pier system has been widely used in non-strong earthquake areas at home and abroad due to its advantages of rapid construction and shorter construction period.At present,the research on seismic performance of precast pier system is not mature,which limits its engineering application in strong earthquake areas.The precast pier system is divided into equivalent cast-in-place connection,non-equivalent cast-in-place connection,UHPC connection and recoverable connection after earthquake.This paper introduces the basic structure,force transfer mechanism and seismic performance of different connection forms,and focuses on the relevant research of UHPC connection and post-earthquake recoverable connection.On this basis,the future research direction of precast pier connection technology is analyzed and prospected to promote the reasonable application of precast pier connection technology in domestic practical projects.
作者 杨东雷 张奉超 别红亮 郭余婷 陈卓 YANG Donglei;ZHANG Fengchao;BIE Hongliang;GUO Yuting;CHEN Zhuo(China Railway First Group Building&Installation Engineering Co.,Ltd.,Xi'an,Shaanxi 710043,China;College of Civil Engineering,Xi'an University of Architecture&Technology,Xi'an Shaanxi 710055,China)
出处 《建筑施工》 2022年第11期2717-2722,共6页 Building Construction
关键词 预制桥墩 等同现浇 非等同现浇 超高性能混凝土 耗能 可恢复功能 precast pier equivalent cast-in-place non-equivalent cast-in-place ultra high performance concrete(UHPC) energy consumption recoverable function
  • 相关文献

参考文献11

二级参考文献47

  • 1朱治宝,刘英.跨海大桥大型预制墩柱的施工技术[J].桥梁建设,2004,34(5):50-52. 被引量:26
  • 2沈阳云.东海大桥墩身节段预制安装的关键技术[J].公路,2005,50(8):7-12. 被引量:24
  • 3David G H, Jonathan M W. Precast concrete pier systems for rapid construction of bridges in seismic regions[ R]. Washington State Transportation Commission, Department of Transportation, WA-RD 611, 2005.
  • 4Kurama Y C. Seismic design of unbonded post-tensioned precast concrete walls with supplemental viscous damping [ J ]. ACI Structural Journal, 2000, 97(4) : 648 -658.
  • 5Kurama Y C, Sause R, Pessiki S, et al. Lateral load behavior and seismic design of unbonded post-tensioned precast concrete walls[J].ACI Structural Journal, 1999, 96(4): 622 -632.
  • 6Kurama Y C, Pessiki S, Sause R, et al. Seismic behavior and design of unbonded post-tensioned precast concrete walls [ J ]. PCI Journal, 1999, 44(3) : 72 -89.
  • 7Silvia Mazzoni, Frank McKenna, Michael H. Open system for earthquake engineering simulation user manual [ M ]. pacific earthquake engineering research center, Berkeley, University of California, USA, 2005.
  • 8Stephen Mahin, Junichi Sakai, Hyungil Jeong. Use of partially prestressed reinforced concrete columns to reduce post-earthquake residual displacements of bridges [ C ]. Fifth National Seismic Conference on Bridges & Highways. San Francisco, 2006, Paper No. B25.
  • 9Hewes J T. Seismic design and performance of precast concrete segmental bridge columns [ D ]. California: University of California, San Diego, C.A. 2002.
  • 10Chou Chungche, Chen Yuchih. Cyclic tests of post- tensioned precast CFF segmental bridge columns with un-bonded strands[ J ]. Earthquake Engineering and Structure Dynamics ,2006,35 (2) :159 -175.

共引文献222

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部