摘要
针对用电信息采集系统业务处理机通信需求量大、通信质量差和通信时间延迟的问题,利用层次化设计的方法实现前置机架构设计,在结构上包括数据采集层、网关接口层、采集应用层和前置机应用层,提高了用电信息采集系统业务处理机运行监控的能力。该方案采用通信资源优化的电力线载波通信路由算法(CRORA)实现通信资源的合理分布,还采用业务处理机通信信道分配算法提高通信质量。试验表明,本研究的方法效率高、准确率高。
Aiming at the problems of high communication demand, poor communication quality and communication time delay of the business processor of the electricity information collection system, the front-end processor architecture design is realized by the method of hierarchical design. The structure includes the data collection layer, the gateway interface layer, and the collection. The application layer and the front-end processor application layer improve the operation and monitoring capabilities of the business processor of the electricity information collection system. The program also uses the communication resource optimization routing algorithm(CRORA) for communication resource optimization to realize the reasonable distribution of communication resources. The communication channel allocation algorithm of the service processor is also used to improve the communication quality. Experiments show that the method proposed in this study is highly efficient and accurate.
作者
周驰
魏巍
ZHOU Chi;WEI Wei(Nanjing NARI Information&Communication Technology Co.,Ltd.,Nanjing 210000,China)
出处
《微型电脑应用》
2022年第12期161-164,共4页
Microcomputer Applications
关键词
用电信息采集
前置机架构
电力线载波通信路由算法
子信号载波
通信资源
power consumption information collection
front-end processor architecture
power line carrier communication routing algorithm
sub-signal carrier
communication resources