摘要
随着风电产业技术的完备,海上风电已进入商业化规模开发阶段,基于广东青洲三海上风电场风机安装项目展开深远海大兆瓦风机运输和风机安装工艺研究,探索一种适用于深远海大兆瓦风电机组运-装组合模式,以提高风机安装效率,降低海上风场建设成本,对海上风电开发具有重要的经济效益。
With the completion of wind power industry technology,offshore wind power has entered the stage of commercial development.Based on the wind turbine installation project of Qingzhou No.3 offshore wind farm in Guangdong Province,this paper conducts the research on the transportation and installation process of far-reaching offshore large-megawatt wind turbines,and explores a combination mode of transportation-installation suitable for far-reaching offshore large-megawatt wind turbine units,so as to improve the installation efficiency of wind turbines and reduce the construction cost of offshore wind farms,which has important economic benefits for the development of offshore wind power.
作者
薛洪志
魏利
陈建林
俞明波
Xue Hong-zhi;Wei Li;Chen Jian-lin;Yu Ming-bo
出处
《电力系统装备》
2022年第10期5-8,共4页
Electric Power System Equipment
关键词
深远海
安装平台
大兆瓦风机
安装工艺
经济效益
far-reaching offshore
wind turbine installation ship
large-megawatt wind turbines
installation process
economic performance