摘要 通过分析某电厂一起安控切机后,发电机脱网、汽轮机跳闸而厂用电快切装置未及时切换,造成6 kV厂用电压严重降低且持续时间长的事故,提出改进措施,以确保机组安全稳定停运,进而分析事故原因并提出预防措施。 China’s power industry is in a period of rapid development.Various high-voltage electrical equipment can be seen in many different fields,which shows its wide range of application in China.By analyzing that after a safety control shutdown in a power plant,the generator was disconnected and the steam turbine tripped,while the auxiliary power fast switching device was not switched in time,resulting in a serious reduction of 6 kV auxiliary voltage and long duration,this paper puts forward improvement measures to ensure the safe and stable shutdown of the unit,and then analyzes the causes of the accident and future preventive measures.
作者 胡斌泰 高山 Hu Bin-tai;Gao shan
出处 《电力系统装备》 2022年第10期8-10,共3页 Electric Power System Equipment
关键词 厂用电 安控装置 发变组保护 快切 auxiliary power safety control device generator transformer unit protection quick cut
  • 相关文献

参考文献2

二级参考文献10

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部