丰满新坝三期泄洪洞封堵监测资料分析

Analysis on Monitoring Data of Hongdong County Dam Closure in Phase III of Fengman New Dam
下载PDF
导出
摘要 本文对丰满新坝三期泄洪洞封堵监测项目进行了介绍。为了判断监测值的变化情况,首先对监测数据进行可靠性检查,然后对各监测物理量的测值进行特征值统计并绘制时空分布曲线,对各物理量进行全面分析,得出分析结论。 This paper introduces the Monitoring Project of Hongdong County Dam closure in Phase III OF FENGMAN new dam. In order to judge the change of the monitoring values,the reliability of the monitoring data is first checked,then the measured values of the monitored physical quantities are statistically analyzed by the eigenvalues and the spatiotemporal distribution curves are drawn,and the physical quantities are comprehensively analyzed,to draw conclusions from the analysis.
作者 李作光 LI Zuoguang(Fengman Hydropower Plant,Jilin 132108,China)
机构地区 丰满发电厂
出处 《水电与抽水蓄能》 2022年第6期74-77,94,共5页 Hydropower and Pumped Storage
基金 国网新源公司科技项目(SGXY-2020F09-2-32)。
关键词 丰满新坝 三期泄洪洞封堵 监测资料分析 fengman new dam phase iii hongdong county dam monitoring data analysis
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部