摘要
本文以马坑铁矿首个二步矿房0-4P为研究对象,采用GeoSLAM公司ZEB-HORIZON三维激光扫描仪自动对一步、二步矿房空区进行扫描,获得了高精度空区点云数据,得到空区三维模型,借助Demine三维建模软件计算出二步采矿房充填体混入量。此方法很好地解决了二步采矿房充填体混入量精确计算的难题,防止将充填体当做矿石计量结算,为矿房结算提供了准确的数据支撑,降低了采矿成本。
Taking the first two-step room 0-4P of Makeng Iron Mine as the research object,this paper uses the zeb-horizon 3D laser scanner of geoslam company to automatically scan the empty area of the one-step and two-step room,obtains the high-precision point cloud data of the empty area,obtains the three-dimensional model of the empty area,and calculates the filling volume of the two-step room with the help of demine 3D modeling software.This method solves the problem of accurate calculation of filling volume in two-step mining room,prevents the filling body from being used as ore measurement and settlement,provides accurate data support for mining room settlement and reduces the mining cost.
作者
陈小兵
李忠金
Chen Xiaobing;Li Zhongjin(Fujian Makeng Mining Co.,Ltd.,Longyan 364021,Fujian)
出处
《福建冶金》
2023年第1期7-9,共3页
Fujian Metallurgy