期刊文献+

考虑服务公平性的定制公交动态响应方案 被引量:2

Instant demand-responsive scheme for customized bus considering service fairness
原文传递
导出
摘要 为使车辆在运行过程中能根据乘客即时需求灵活调整线路,提出了一种定制公交动态响应方案。使用节点插入算法为乘客确定备选线路,考虑迟到乘客处理和线路运营收益计算等实际问题。实行“人等车”的机制,合理利用乘客可接受的等待时间,减少误车情况的发生,杜绝拒载现象,保证服务公平性。以河北省雄安新区的定制公交网络验证了模型及算法的有效性,研究结果表明:该方案能在满足乘客时间窗和保障公交运营商收益的前提下,有效应对乘客迟到的情况。 An instant demand-responsive scheme for the customized bus(CB)is proposed,which enables vehicles to flexibly adjust routes according to the immediate needs of passengers during operation. A node insertion algorithm is developed to consider practical issues,such as late passenger handling and profit calculation. The implementation of "passenger waiting for bus" mechanism and consideration of passenger acceptable waiting time reduce the occurrence of passenger’s bus-missing. In addition,strictly preventing the active rejection of loading can also ensure the fairness of CB service. The proposed model and algorithm are verified by a numerical example based on the CB network of Xiong’an district,Hebei province. The results show that the instant demand-responsive scheme can effectively deal with the situation of passengers being late under the premise of guaranteeing the CB system profit and meanwhile satisficing passengers’ service time window.
作者 汪怡然 陈景旭 王岳平 霍锦彪 刘志远 Yi-ran WANG;Jing-xu CHEN;Yue-ping WANG;Jin-biao HUO;Zhi-yuan LIU(School of Transportation,Southeast University,Nanjing 210096,China;Xiong'an Investment,China Communications Construction Co.,Ltd.,Baoding 071700,China)
出处 《吉林大学学报(工学版)》 EI CAS CSCD 北大核心 2022年第11期2574-2581,共8页 Journal of Jilin University:Engineering and Technology Edition
基金 国家重点研发计划项目(2018YFB1600900) 国家自然科学基金项目(71901059) 江苏省自然科学基金项目(BK20180402)。
关键词 交通运输系统工程 定制公交 需求响应 线路规划 节点插入算法 engineering of communication and transportation system customized bus demand response route planning knot insertion algorithm
  • 相关文献

参考文献5

二级参考文献37

  • 1杨国兴.一种多出发点多旅行商问题到旅行商问题的转换[J].系统工程理论方法应用,1993,2(3):66-68. 被引量:5
  • 2卢厚清,王辉东,黄杰,李波.任务均分的多旅行商问题[J].系统工程,2005,23(2):19-21. 被引量:27
  • 3Verma A,Dhingra S L. Feeder bus routes generation within integrated mass transit planning framework [J]. Jouranl of Transportation Engineering, 2005, 131(11) :822-834,.
  • 4Kuan S N, Ong H L, Ng K M. Solving the feeder bus network design problem by genetic algorithms and ant colony optimization[J]. Advances in Engineering Software,2006,37(6):351-359.
  • 5Shrivastav P, Dhingra S L. Development of feeder routes for suburban railway stations using heuristic approach[J]. Journal of Transportation Engineer- ing, 2001,127 (4) : 334-341.
  • 6Lee Y J, Vuchic V R. Transit network design with variable demand[J], Journal of Transportation Engi- neering, 2005,131 (1) : 1-10.
  • 7Fan W, Machemehl R B, Optimal transit route net work design problem with variable transit demand genetic algorithm approach[J]. Journal of Transpor tation Engineering, 2006,132 (1) : 40-51.
  • 8Bruun E C, Marx E. OmniLink: case study of success- ful flex-route-capable intelligent transportation system implementation [ J ]. Transporation Research Record, 2006,1971:91 - 98.
  • 9Koffman D. Operational experiences with flexible transit services: a synthesis of transit practice, TCRP Report 53 [ R]. Washington, DC: Transportation Research Board of the National Academies, 2004.
  • 10Daganzo C F. Checkpoint dial-a-ride systems [ J ]. Transportation Research Part B, 1984,15( 4/5 ) :315 - 327.

共引文献98

同被引文献16

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部