摘要
泵站工程是灌溉抗旱设施的重要组成之一,承担着抽水扩灌的职能和任务。泵站改造工程设计是对其整体构成,材料元件使用,技术应用再次优化,要求对症施治,注重创新。灌区泵站改造工程一般是利用非灌溉间隙时间(3-4个月)对主副厂房、机电设备、变电站、等进行改造。位于黄河下游的北滩灌区,建成时受资金、技术等条件,灌区工程建设标准低、质量差,渠道及渠系建筑物配套程度低;因此需要对灌区进行改造。
The pump station project is one of the important components of irrigation and drought relief facilities, which undertakes the functions and tasks of pumping and expanding irrigation. The design of the pump station reconstruction project is to optimize its overall composition, the use of materials and components, and the application of technology again. It is required to treat the symptoms and pay attention to innovation. The reconstruction project of pump station in irrigation area generally uses the non irrigation interval time(3-4 months) to reconstruct the main and auxiliary power houses, electromechanical equipment, substations, etc. Beitan irrigation area,located in the lower reaches of the Yellow River, was built with low construction standards, poor quality and low supporting degree of canal and canal system buildings due to capital, technology and other conditions. Therefore, it is necessary to transform the irrigation area.
作者
李影
LI Ying(Water Conservancy Bureau of Lankao County,Lankao 475300,China)
出处
《河南水利与南水北调》
2022年第10期59-60,共2页
Henan Water Resources & South-to-North Water Diversion
关键词
灌区
泵站工程
更新改造
设计
irrigation area
pump station works
renovation
design