平底直墙三联拱管廊暗挖隧道施工技术与研究

CONSTRUCTION TECHNOLOGY AND RESEARCH OF TUNNEL WITH FLAT BOTTOM STRAIGHT WALL AND TRIPLE ARCH PIPE GALLERY
下载PDF
导出
摘要 以石家庄正定新区安济路综合管廊工程暗挖段为背景,根据其周边环境的独特性,拟采取的2种设计方案,对比分析初期支护断面形式、受力体系转化、机械使用条件、安全、工期、成本等多个方面,选出最佳方案设计,设计关键技术措施,并在项目中成功应用,对今后类似砂层地区管廊暗挖隧道横穿构筑物的设计有重要的借鉴意义。 Taking the underground excavation section of Anji Road Comprehensive Pipe Gallery Project in Zhengding New District of Shijiazhuang as the background, according to the uniqueness of its surrounding environment, the two design schemes proposed to be adopted are compared and analyzed in terms of initial support section type, stress system transformation, mechanical use conditions, safety, construction period, cost, etc., to select the best scheme design, design key technical measures, and successfully apply them in the project. It has an important reference significance for the design of tunnel crossing structures in similar sand layer areas in the future.
作者 崔怀春 杨国富 Cui Huai-chun;Yang Guo-fu
出处 《建筑技术开发》 2022年第23期129-131,共3页 Building Technology Development
关键词 三联供 错距 PBA 偏压 扣拱 triple supply staggered distance PBA bias voltage buckle arch
  • 相关文献

参考文献4

二级参考文献41

共引文献82

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部