期刊文献+

海底管道及膨胀弯海上安装效率分析研究

Analysis and study on installation efficiency of subsea pipeline and spool pieces
下载PDF
导出
摘要 海底管道及膨胀弯海上安装效率影响因素包括方案设计、船舶能力、天气海况、设备待机以及人员素质等。文章通过研究南海西部涠洲11-2油田二期开发工程项目海底管道及膨胀弯计划铺设与实际铺设的工期对比,分析存在差异的原因,探讨提升海上安装效率的措施,为其他海上安装项目提升效率提供经验借鉴。 The factors affecting the offshore installation efficiency of submarine pipelines and spool pieces include scheme design, ship capacity, weather and sea conditions, equipment standby and personnel quality. By studying the comparison between the planned laying and actual laying of submarine pipelines and spool pieces in the second phase development project of WZ11-2 oilfield in the western South China Sea, the paper analyzes the reasons for the differences, discusses the measures to improve the efficiency of offshore installation, and provides experience for other offshore installation projects to improve the efficiency.
作者 冯爱民 张璐 董兆佳 韩延波 左胜 Feng Aimin;Zhang Lu;Dong Zhaojia;Han Yanbo;Zuo Sheng(China Offshore Oil Engineering Co.,Ltd.,Tianjin 300461,China;Shenzhen Marine Engineering and Technical Service Co.,Ltd.,Shenzhen 518067,China)
出处 《江苏科技信息》 2022年第35期60-63,共4页 Jiangsu Science and Technology Information
基金 海洋石油工程股份有限公司生产项目,项目编号:C-0821002。
关键词 海底管道 膨胀弯 海上安装 提升效率 subsea pipeline spool pieces offshore installation promote efficiency
  • 相关文献

参考文献4

二级参考文献15

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部