摘要
针对九江钢铁现阶段生产现状,分析了制约铁前系统成本的主要矛盾,提出了降成本的主要措施。
In view of the current production situation of Jiujiang Pinggang Steel Co.,Ltd.,the main contradictions restricting the cost of Before-ironmaking System are analyzed,and the main measures to reduce the cost are proposed.
作者
余映红
Yu Yinghong(Technical Center of Jiujiang Pinggang Steel Co.,Ltd.Jiujiang 332500,China)
出处
《冶金信息导刊》
2022年第6期40-42,共3页
Metallurgical Information Review
关键词
成本
锌负荷
炉温
配比
cost
Zinc load
furnace temperature
mixture ratio