摘要 雅砻江两河口水电站初期导流洞下闸准备对门槽填框试提及下放、闸门门槽及周边水下探摸、下闸应急预案等关键技术,对下闸过程中及下闸后遇到了一些问题提供了有效的技术手段,取得了很好的效果,确保了下闸成功。同时,为后续导流洞封堵施工创造了有利条件。 The key technologies of gate slot filling frame test, gate slot and surrounding underwater exploration,emergency plan for gate closure, are mentioned in the preliminary preparation for gate closure of diversion tunnel of Lianghekou Hydropower Station in Yalong River. This paper provides effective technical measures for problems encountered during and after gate closing, and achieves good results and ensures successful gate closing.At the same time, it creates favorable conditions for subsequent closure construction of diversion tunnel.
作者 武晓杰 施召云 WU Xiao-jie;SHI Zhao-yun(Power China Chengdu Engineering Corporation Limited,Chengdu 611130,China;Yalong River Hydropower Development Company.Ltd.,Chengdu 610051,China)
出处 《云南水力发电》 2022年第12期328-331,共4页 Yunnan Water Power
关键词 导流洞 门槽检查 门槽填框试提及下放 水下探摸及检查 水下修补 闸门渗漏水处理 diversion tunnel door groove inspection door slot filling frame trial mention lowering underwater exploration and inspection underwater repair treatment of gate leakage water
  • 相关文献

参考文献3

二级参考文献9

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部