摘要
我国城市更新工作进入新阶段,面临目标、方法、路径等多重转变,存量更新属性的片区规划设计须经济、社会、生态价值并重,既要坚持生态优先、历史文脉传承等规划设计的基本价值,又要适应实施“多路径融合”的融资模式,保障项目落地的资金需求。本文通过东营科教园片区城市设计项目的规划实践,探索通过将融资模式的制约条件前置,与城市设计价值取向相融合的更新型地区规划设计方法,促进设计方案与实施路径的精准对接,提升规划的可实施性。
The urban renewal work in our country has entered a new stage,facing multiple changes in objectives,methods and paths.The planning and design of the area with the attribute of stock renewal needs to pay equal attention to economic,social and ecological values.It is necessary to adhere to the basic values of planning and design such as ecological priority and historical context inheritance,and also adapt to the financing mode of“multi-path integration”in the implementation to ensure the funding needs of the project implementation.Through the planning practice of the urban design project in the Dongying Science and Education Park area,this paper explores a new regional planning and design method that integrates the constraints of the financing model with the value orientation of urban design,promotes the precise connection between the design scheme and the implementation path,and improves the feasibility of the planning.
作者
李君
刘涛
苏海威
林嘉敏
LI Jun;LIU Tao;SU Haiwei;LIN Jiamin(CAUPD Beijing Planning&design Consultants Ltd;Fujian University of Technology)
出处
《城市设计》
2022年第3期6-13,共8页
Urban Design
关键词
城市更新
城市设计
实施导向
东营科教园
Urban renewal
Urban design
Implementation orientation
Dongying Science and Education Park