期刊文献+

河南省宝泉抽水蓄能电站下库大坝渗流特征分析 被引量:1

Analysis of seepage in lower reservoir dam of Baoquan Pumped Storage Power Station in Henan Province
下载PDF
导出
摘要 为增加水力发电量,将河南省宝泉水库改建为抽水蓄能电站枢纽下水库大坝,以扩大水库库容并满足装机发电需要。改建大坝包括加高、加厚、增设钢筋混凝土防渗面板及监测设施。多年渗流监测资料及综合性成果表明:局部裂缝引起大坝混凝土防渗面板渗压值增大,但新老坝胶结处未出现渗水现象,新加厚坝体内部基本未测出渗流量,面板局部渗流量未渗透到坝体内,反映大坝工作性态正常。 In order to increase the hydropower generation,Baoquan Reservoir in Henan Province was reconstructed into lower reservoir dam of Baoquan Pumped Storage Power Station to increase the storage and meet the power generation demand.Reconstruction project included the dam heightening,dam thickening,adding reinforced concrete faces and monitoring instruments.The long-term monitoring statistics and the comprehensive analysis results showed that the increased seepage pressure in reinforced concrete faces was due to the dam partial crack;there was no seepage flow in dam interface of old and new dam body nor inside the thickening dam body,and the local seepage of the panel didn t flow into the dam body.These results indicated that the dam is in normal operation.
作者 李立平 李程程 LI Liping;LI Chengcheng(Institute of Engineering Safety and Disaster Prevention,Yangtze River Scientific Research Institute,Wuhan 430010,China;Guangxi Datengxia Industrial Management Co.,Ltd.,Nanning 530000,China)
出处 《水利水电快报》 2023年第1期72-76,共5页 Express Water Resources & Hydropower Information
关键词 大坝安全监测 防渗面板 渗漏特征 宝泉抽水蓄能电站 河南省 dam safety monitoring seepage control panel leakage characteristics Baoquan Pumped Storage Power Station Henan Province
  • 相关文献

参考文献4

二级参考文献10

共引文献10

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部