期刊文献+

巴基斯坦卡洛特水电站导流洞水工模型试验研究 被引量:2

Hydraulic model research of diversion tunnels on Karot Hydropower Project in Pakistan
下载PDF
导出
摘要 为了研究巴基斯坦卡洛特水电站导流洞的泄流能力、水流流态及出口消力池消能效果,同时验证导流洞设计的合理性,运用导流洞水工模型试验,模拟了各种工况下导流洞进出口水流形态、流速分布等。试验结果表明:模型泄流能力值与计算值一致,进出口水流较平顺,洞身段均未出现负压,经过消力池后河床底部流速值显著降低。研究成果证明了导流洞各段体型设计合理有效,消力池消能效果显著。 To analyze the discharging capacity,flow state and the energy dissipation of diversion tunnels on Karot Hydropower Project in Pakistan,together to confirm that the design was appropriate,the flow state and velocity of inlet and outlet under all work conditions were simulated by the hydraulic model test of diversion tunnels.The test results demonstrated the values of discharging capacity between test and calculation were familiar,the flow state of inlet and outlet was smooth,the pressure flow was positive at all the sections and the velocity of river bed downstream the plunge pool was obviously reduced.These results confirmed that the diversion tunnel design is proper and the energy dissipation is well.
作者 岳朝俊 陈道春 窦俊波 林三才 曾钰 YUE Chaojun;CHEN Daochun;DOU Junbo;LIN Sancai;ZENG Yu(Changjiang Survey,Planning,Design and Research Co.,Ltd.,Wuhan 430010,China)
出处 《水利水电快报》 2023年第1期87-89,109,共4页 Express Water Resources & Hydropower Information
关键词 导流洞 水工模型 泄流能力 水流流态 卡洛特水电站 巴基斯坦 diversion tunnel hydraulic model discharging capacity flow state Karot Hydropower Project Pakistan
  • 相关文献

参考文献2

二级参考文献6

  • 1祁庆和.水工建筑物(第二版)[M].北京:水利电力出版社,1986..
  • 2成都科学技术大学水力学教研室.水力学[M].北京:人民教育出版社,1979..
  • 3中华人民共和国水利部.SL155-95水工(常规)模型试验规程[S].北京:中国水利水电出版社,1995.
  • 4中华人民共和国水利部.SL99-95河工模型试验规程[S].北京:中国水利水电出版社,1995.
  • 5吴持恭.水力学[M].北京:高等教育出版社,1983:280-283.
  • 6梁文龙,李贵平,余跃.隧洞进水口及洞内消能水工模型试验研究[J].贵州工业大学学报(自然科学版),2001,30(3):95-100. 被引量:6