绩溪抽水蓄能电站1号机组输水系统首次充排水试验浅析 被引量:2

First Water Filling and Drainage Test of Water Conveyance System of Unit 1 in Jixi Pumped Storage Power Station
下载PDF
导出
摘要 绩溪抽水蓄能电站输水系统充排水试验目的是通过试验检查工程质量,查找输水系统可能存在的问题,以便及时采取措施进行处理,消除隐患,保障电站安全运行。文章详细描述了电站引水系统、机组段和尾水系统的充排水试验方案、前置条件、过程和结果。输水系统充排水试验的成功,为机组调试、运行提供了基础条件。 The purpose of the filling and drainage test of the water conveyance system of the Jixi Pumped Storage Power Station is to check the engineering quality through the test, find out the possible problems of the water conveyance system, so as to take timely measures to deal with them, eliminate hidden dangers and ensure the safe operation of the power station. This paper describes in detail the test scheme, preconditions, process and results of filling and drainage of water diversion system, unit section and tailrace system of power station. The success of the filling and drainage test of the water conveyance system provides the basic conditions for the commissioning and operation of the unit.
作者 张增 ZHANG Zeng(China Northwest Water Conservancy&Hydropower Engineering Consulting Co.,Ltd.,Xi′an 710100,China)
出处 《红水河》 2022年第6期22-26,共5页 Hongshui River
关键词 输水系统 充水试验 排水试验 绩溪抽水蓄能电站 water conveyance system water filling test drainage test Jixi Pumped Storage Power Station
  • 相关文献

同被引文献16

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部