随着经济的进步和发展,大跨度建筑数量越来越多,在很多建筑工程项目施工过程中都会应用顶升法施工工艺进行施工,和其他技术相比,该技术具有简化施工流程、提升施工效率的作用。本文结合福州市某综合类医院工程,分析大跨度钢结构顶升法相关的施工控制技术,以期为同类项目提供参考和借鉴。
With the progress and development of economy,the number of large-span buildings are emerging more and more.In the construction process of many construction projects,the jack-up method are widely used for construction.Compared with other technologies,this technology has the function of simplifying the construction process and improving the construction efficiency.This paper takes a general hospital project in Fuzhou as example,and analyzes the jack-up method related construction control technology in large-span steel structures,in order to provide reference for similar projects.
出处
《住宅产业》
2022年第12期74-77,共4页
Housing Industry
关键词
大跨度
钢结构
顶升法
控制技术
large span
steel structure
jack-up method
control technology