期刊文献+

淠东干渠续建配套与现代化改造石集航道口段洪峰流量计算与分析

Calculation and analysis of flood peak Discharge at the mouth of Shiji Waterway in the renewal and modernization of Pidong Trunk Canal
下载PDF
导出
摘要 淠东干渠因石集航道口汇流范围内下垫面条件发生变化,重新计算洪峰流量,通过合理性分析确定了淠东干渠石集航道口处20年一遇、50年一遇设计洪峰流量。根据计算结果和渠道运行安全要求,提出了淠东干渠石集航道口段渠道级别应调整为Ⅱ级、防洪标准应调整为30年一遇的政策建议。 The flood peak flow was recalculated due to the change of underlying surface conditions in the confluence area of Shiji waterway mouth of Pidong trunk canal,and the design flood peak flow was determined by rationality analysis to flood occur once in 20 years and once in 50 years at Shiji waterway mouth of Pidong trunk canal.According to the calculation results and the safety requirement of the channel operation,the policy suggestion that the channel level should be adjusted to gradeⅡand the flood control standard should be adjusted to once in 30 years is put forward.
作者 时兆中 SHI Zhaozhong(Anhui Pi-shi-hang Irrigation District Management Bureau,Lu'an 237005)
出处 《中国防汛抗旱》 2022年第12期79-81,88,共4页 China Flood & Drought Management
关键词 淠东干渠 石集航道口段 洪峰流量 工程等级 防洪标准 Pidong trunk canal Shiji channel mouth section flood peak flow engineering grade flood control standard

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部