摘要
胜利发电厂灰场36 MW光伏发电项目利用胜利发电厂原储存粉煤灰的灰场的两个区域进行建设,以这一项目为例,对粉煤灰地质条件下建设光伏发电项目进行论述。介绍了场地情况,分析了项目建设难点,提出了攻坚克难的典型做法,并总结了项目建设过程中的创新点。
The 36 MW photovoltaic power generation project at Shengli Power Plant ash field utilizes two areas of the ash field where the Shengli Power Plant originally stored coal ash.Taking this project as an example,the construction of PV power generation project under coal ash geologic condition was discussed.The site situation was introduced,the difficulties of project construction were analyzed,the typical practices of overcoming difficulties were proposed,and the innovation points in the project construction process were summarized.
作者
李云
张东明
刘金亮
Li Yun;Zhang Dongming;Liu Jinliang
出处
《上海电气技术》
2022年第3期5-9,共5页
Journal of Shanghai Electric Technology
关键词
粉煤灰
地质
光伏发电
建设
Coal Ash
Geology
PV Power Generation
Construction