摘要
结合萧山国际机场三期交通中心工程,对高空遮阳膜跨越障碍吊装施工技术进行了研究。通过对施工难点及安全风险点进行分析,在施工过程中对垂直吊装和跨越障碍后的平行移动路线进行规划,最终顺利完成了施工,总结的经验可为类似项目提供参考。
Combined with the third phase traffic center project of Xiaoshan International Airport, the hoisting construction technology of high-altitude sunshade film spanning obstacles is studied. Through the analysis of construction difficulties and safety risk points, the vertical lifting and parallel movement route after crossing obstacles are planned during the construction process, and the construction is successfully completed. The experience summarized can provide reference for similar projects.
作者
郝加生
欧传超
冯井方
敖开银
于巧巧
江奎
杨子旭
HAO Jiasheng;OU Chuanchao;FENG Jingfang;AO Kaiyin;YU Qiaoqiao;JIANG Kui;YANG Zixu(Huading Construction Decoration Engineering Co.,Ltd.,Shanghai 200333,China)
出处
《建筑施工》
2022年第12期2908-2911,共4页
Building Construction
关键词
遮阳膜
跨越障碍
分板块吊装
装配式安装
sun visor
crossing obstacle
hoisting by plate