摘要 当GIS变电站中隔离开关操作空载母线时,会形成特快速瞬态过电压波,此电压波在遇到波阻抗不连续处会发生多次折反射,在GIS外壳上形成暂态外壳过电压,影响电力系统的稳定运行。利用ATP软件搭建内部与外壳耦合的500 kV变电站的仿真电路,计算了超高压GIS变电站中TEV的幅值、频率及陡度特性,进而分析TEV的影响因素,得出在工程实际中较适宜的抑制TEV水平的措施。 When the disconnector in the GIS substation operates the no-load busbar,an extremely fast transient overvoltage wave is formed.This voltage wave will be refracted and reflected multiple times when it encounters wave impedance discontinuity,forming a transient shell overvoltage on the GIS shell,which affects the stable operation of the power system.ATP software was used to build a simulation circuit for a 500 kV substation coupled internally to the shell.The amplitude,frequency and steepness characteristics of TEV in ultra-high voltage GIS substation are calculated,and then the influencing factors of TEV are analyzed,and the appropriate measures to suppress the TEV level in engineering practice are obtained.
作者 张文杰 于航 ZHANG Wenjie;YU Hang(Maintenance Company of Henan Electric Power Corporation,Zhengzhou 450052,China)
出处 《电工技术》 2022年第23期227-230,共4页 Electric Engineering
关键词 外壳耦合 合闸相位 不同运行方式 接地引线 shell coupling close phase different operation mode grounding lead
  • 相关文献

参考文献3

二级参考文献49

  • 1李六零,胡攀峰,何涛,邱毓昌.一种限制GIS暂态地电位升高的措施[J].高压电器,2005,41(2):113-115. 被引量:7
  • 2项玲,胡敏强,郑建勇.运用EMTP预测变电所接地网雷电暂态效应[J].高电压技术,2005,31(6):69-72. 被引量:23
  • 3齐磊,崔翔.变电站开关操作对屏蔽电缆电磁干扰的预测[J].中国电机工程学报,2007,27(9):46-51. 被引量:34
  • 4徐国政,张节容.高压断路器原理和应用[M].北京:清华大学出版社,2006.
  • 5张仁豫,陈昌渔,王昌长.高电压试验技术[M].北京:清华大学出版社.2005.
  • 6江缉光,刘秀成.电路原理[M].北京:清华大学出版社,1997.
  • 7Bo Zhang, Xiang Cui, Zhibin Zhao et al. Numerical analysis of the influence between large grounding grids and two- end grounded Cables by the moment method coupled with circuit equations[J]. IEEE Trans. on Power Delivery, 2005,20(2) :731 - 737.
  • 8F. Bmyde, E. Gave.lie.r, Co mparison of coupling mechanisms on multicoductor cables. IEEE Trans. on EMC, 1993, 35(4) :409-416.
  • 9Han Ke,Wei- Jen Lee, Mo-shing Chen et al. Grounding techniques and induced surge voltage on the control signal cables[ J ]. IEEE Trans. on Industry Application,1998,34(4):663 -668.
  • 10D.E. Thomas, C.M. Wiggins, T.M. Salas et al. Induced transients in substation cable: measurements and models[J ]. IEEE Trans. on Power Delivery, 1994, 9(4) : 1861 - 1867.

共引文献32

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部