摘要
阐述国水利水电施工技术中出现的问题,并提出了解决对策,将单一项目的进度安排、计划与整体安排结合在一起,在保证施工质量的同时加快工程完成速度。
This paper expounds the problems in the construction technology of national water conservancy and hydropower,and puts forward some countermeasures,which combine the schedule,plan and overall arrangement of a single project to ensure the construction quality and speed up the completion of the project.
作者
吕存龙
LYU Cunlong(Flood Control and Drought Relief Security Center of Mulan County,Harbin,Heilongjiang 151900,China)
出处
《集成电路应用》
2022年第12期212-213,共2页
Application of IC
关键词
施工技术
进度安排
施工质量
construction technology
schedule
construction quality