摘要 介绍某电厂低压缸零出力改造前后7号低加无水位、温升异常的分析与处理过程,通过抽汽管路连接分析、管壁温度测量、温度计校验、汽侧放空气门内漏消除等成功解决了相关异常,为类似问题的处理提供了借鉴。 An introduction is made on the analysis and treatment process of No. 7 low-pressure heater without water level and abnormal temperature rise before and after zero output transformation of low-pressure cylinder in a power plant. Relevant anomalies are successfully solved based on the analysis of steam pipe connection, measurement of tube-wall temperature, thermometer calibration, and elimination of internal leakage of steam-side vent valves, etc., which offers reference for the treatment of similar problems.
作者 张黎明 王俊杰 陈科镭 张艳霞 ZHANG Liming;WANG Junjie;CHEN Kelei;ZHANG Yanxia(SPIC Nanyang Thermal Power Co.,Ltd.,Nanyang 473000)
出处 《电力安全技术》 2022年第12期27-29,共3页 Electric Safety Technology
关键词 低压加热器 零出力改造 切缸 温升 low-pressure heater zero-output transformation cylinder transfer temperature rise
  • 相关文献

参考文献1

二级参考文献3

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部