针对变电站新建、改扩建工程等大型启动倒闸操作,提出基于票面多级审核制、操作疑点会商制、分组全程备班制的“三制”工作法,实现了大型启动倒闸操作全过程规范有序、风险可控,为变电站新建及改扩建工程安全管理提供参考。
In view of large-scale startup switching operations such as new substation construction,reconstruction and expansion projects, a "three system" working mechanism based on the multi-level ticket review system, the operation doubt consultation system, and the group-level whole process shift preparation system is proposed, which realizes the whole process of large-scale startup switching operations in a standardized and orderly manner with controllable risks, and offers reference for the safety management of new substation construction, reconstruction and expansion projects.
作者
王勇杰
崔福耀
WANG Yongjie;CUI Fuyao(Xuzhou Power Supply Company,Xuzhou 221000)
出处
《电力安全技术》
2022年第12期71-73,共3页
Electric Safety Technology
关键词
变电站
启动倒闸操作
“三制”工作法
安全管控
substation
start the switching operation
"three systems"working mechanism
safety control