变电站大型操作“三制”工作法应用

Application of "Three Systems" Working Mechanism for Large-scale Startup Operations of Substation
下载PDF
导出
摘要 针对变电站新建、改扩建工程等大型启动倒闸操作,提出基于票面多级审核制、操作疑点会商制、分组全程备班制的“三制”工作法,实现了大型启动倒闸操作全过程规范有序、风险可控,为变电站新建及改扩建工程安全管理提供参考。 In view of large-scale startup switching operations such as new substation construction,reconstruction and expansion projects, a "three system" working mechanism based on the multi-level ticket review system, the operation doubt consultation system, and the group-level whole process shift preparation system is proposed, which realizes the whole process of large-scale startup switching operations in a standardized and orderly manner with controllable risks, and offers reference for the safety management of new substation construction, reconstruction and expansion projects.
作者 王勇杰 崔福耀 WANG Yongjie;CUI Fuyao(Xuzhou Power Supply Company,Xuzhou 221000)
出处 《电力安全技术》 2022年第12期71-73,共3页 Electric Safety Technology
关键词 变电站 启动倒闸操作 “三制”工作法 安全管控 substation start the switching operation "three systems"working mechanism safety control
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部