摘要
建设工程初步设计概算为国家控制工程造价的最高限额,概算编制的合理性,是保证建设工程及其管理工作顺利开展的前提与基础。施工总承包项目,特别是前期方案不太完善甚至有漏项的施工总承包项目,施工总承包单位协助概算编制单位,根据项目实际情况,经分析研究,采取有效措施,督促概算修编工作高质量的完成显得尤其重要。
The preliminary design estimate of construction project is the maximum limit of national control project cost. The reasonableness of the estimate is the premise and foundation for the smooth development of construction project and its management. General construction contracting projects, especially those with imperfect preliminary plans or even missing items, It is particularly important for the general contractor to assist the budget estimate preparation unit, according to the actual situation of the project, through analysis and research, take effective measures to supervise the high-quality completion of the budget estimate revision.
作者
韩秀赟
谈小庆
AHN Xiu-yun;TAN Xiao-qing(CSCEC AECOM Consultants Co.,Ltd,Lanzhou73000,China;China Railway Fifth Bureau South China Engineering Co.,Ltd,Dongguan 523106,China)
出处
《铁路工程技术与经济》
2022年第6期63-65,共3页
Railway Engineering Technology and Economy
关键词
概算修编
定额
造价
Budgetary estimate of revision
quota
cost