摘要
结合BSG水电站枢纽布置及地形地质条件拟定上、下两个厂址,主要从水能利用、引水系统建筑物布置、发电厂房布置、地质条件、施工组织、投资6个方面对BSG水电站厂房位置进行了经济技术比较。选定上厂址为推荐厂房位置方案。
Two upper and lower plant sites are proposed in combination with layout of BSG hydropower station complex and topographic and geological conditions. This paper mainly compares the location of BSG hydropower plant from six aspects: utilization of water energy, layout of structures in water diversion system, layout of power house, geological conditions, construction organization and investment. The upper plant site is selected as the recommended plant location scheme.
作者
李艳娜
孔宇田
王坤
周洲
余扬
LI Yan-na;KONG Yu-tian;WANG Kun;ZHOU Zhou;YU Yang(Guizhou Equipment Manufacturing Polytechnic,Guiyang 551400,China;Power China Guiyang Engineering Corporation Limited,Guiyang 550081,China)
出处
《云南水力发电》
2023年第1期116-120,共5页
Yunnan Water Power
关键词
BSG水电站
厂房
非洲赤道地区
位置选择
BSG Hydropower Station
power house
equator region of Africa
location selection