瑞丽江一级水电站闸门水平偏扭问题处理 被引量:1

Treatment of Horizontal Defiection of Gate of Ruilijiang I Hydropower Station
下载PDF
导出
摘要 阐述了瑞丽江一级电站调压井事故检修门在日常运行中存在的问题,对产生问题的原因进行分析,并提出了3种改造方案,为保证发电效益,结合电站的实际运行情况,选择更换无旋钢丝绳来解决闸门水平偏扭问题,同时施工不影响电站日常发电运行的处理方案。 This paper describes the problems existing in the daily operation of surge shaft accident overhaul gate of Ruilijiang I Hydropower Station, analyses the causes of the problems, and proposes three retrofit schemes.In order to ensure the power generation benefit, combined with the actual operation of the power plant, the replacement of non-rotating wire rope is selected to solve the problem of horizontal deflection of the gate, while the construction does not affect the daily power generation operation of the power plant.
作者 郭鸿鹅 胡希光 黄光辉 GUO Hong-e;HU Xi-guang;HUANG Guang-hui(Yunnan United Electric Power Development Co.,Ltd.,Ruili 678600,China)
出处 《云南水力发电》 2023年第1期212-214,共3页 Yunnan Water Power
关键词 水电站 闸门 水平偏扭 无旋钢丝绳 hydropower station sluice gate horizontal deflection rollerless wire rope
  • 相关文献

参考文献2

二级参考文献3

  • 1杨清华,李超洋.天生桥二级水电站调压井事故检修闸门改造可行性研究报告[R].贵阳:中国水电顾问集团贵阳勘测设计研究院,2008.
  • 2GB10597-2011,卷扬式启闭机[s].
  • 3DL/T5019-1994,水利水电工程启闭机制造及安装验收规范[s].

共引文献4

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部