期刊文献+

水工建筑工程质量计划及控制管理 被引量:1

Quality Planning and Control Management of Hydraulic Engineering
下载PDF
导出
摘要 在过去的几年中,中国已初步实现了水利事业的发展,水工建筑工程具有投资规模大,专业性强和建设周期长的特点,其能够推动社会发展、做到保护人民财产和生命安全的作用,同时在防洪、供水、灌溉几个方面都能起到非常重要的作用。但是现如今的水工建筑工程过程中往往只注重进度,忽略了质量的重要性,所以,水工建筑工程项目开始的实施必须要科学全面地制定控制策略,基于此,对水工建筑工程的质量计划及控制管理进行了研究。 China has initially realized the development of water conservancy in the past few years. Hydraulic engineering is characterized by large investment scale, strong specialization and long construction period.It can promote social development and protect people’s property and life safety. At the same time, it plays a very important role in flood control, water supply and irrigation. But nowadays, in the process of hydraulic construction engineering, only progress is paid attention to and the importance of quality is neglected. Therefore,the implementation of hydraulic construction project must scientifically and comprehensively formulate control strategy. Based on this, the quality planning and control management of hydraulic construction project are studied.
作者 赵恺 ZHAO Kai(POWERCHINA SINOHYDRO ENGINEERING BUREAU 12 CO.,LTD.,Hangzhou 311600,China)
出处 《云南水力发电》 2023年第1期279-283,共5页 Yunnan Water Power
关键词 水工 裂缝 工程质量计划 控制管理 water conservancy project crack engineering quality plan control management
  • 相关文献

参考文献10

共引文献28

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部