摘要
工业建筑行业的不断发展,对建筑工程质量提出了更高要求,而施工过程中出现的各种问题也会影响工程项目建设。因此在实际操作时应做好以下三点工作:其一要确保土建结构设计与图纸设计符合相关标准和规范以及工艺流程;其二要保证管道安装位置合理、材质符合介质要求、密封性良好并具有一定防腐能力;其三需要严格控制混凝土浇筑时的塌落度、外加剂的性能和参量及振捣次数等质量指标。文章主要从石油化工装置土建施工质量存在的问题和石油化工装置土建施工质量问题的预控策略等方面进行分析。
With the continuous development of Industrial construction industry, the quality of construction engineering has put forward higher requirements, and various problems in the construction process will also affect the construction of engineering projects. Therefore, in the actual operation should do the following work: first, to ensure that the civil structure design and drawing design in accordance with the relevant standards and norms and process flow. Second, to ensure that the pipeline installation location is reasonable, the material meets the requirements of the medium, the sealing is good and has a certain anti-corrosion ability. Third, it is necessary to strictly control the concrete pouring collapse degree, admixture performance and parameters and vibration times and other quality indicators. This paper mainly analyzes the problems existing in the construction quality of petrochemical plant and the pre-control strategy of the construction quality problems of petrochemical plant.
作者
牛国荣
NIU Guo-rong(Sinochem Erjian Group Co.,Ltd.,Linfen 030021,China)
出处
《化工管理》
2023年第2期165-168,共4页
Chemical Engineering Management
关键词
石油化工装置
土建施工
质量
petrochemical plant
civil construction
quality