预应力双T板施工管理

The Construction Management of Prestressed Double T Board
下载PDF
导出
摘要 30 m预应力双T板采用先张法施工,存在构件体积大、壁薄、刚度差、重量大和吊装困难等问题。选好双T板生产厂家、确保构件质量以及加强双T板的制作、运输、吊装施工等全过程管理,直接关系到工程质量、进度、造价及安全,而双T板的制作更是质量控制的关键。本文论述了双T板的制造、运输和吊装的质量控制。 Pre-tensioned construction method is adopted for construction of 30 m prestressed double T board,its components have large volume,thin wall,poor stiffness,large weight and it’s difficult for hoisting.Choosing appropriate double T board’s manufacture,ensuring the component quality’s safety,strengthen the process management of double T board’s production,transportation and hoisting construction are very important to the quality,progress,cost and safety of the project,and the production of double T board is the most important part of its’quality control.This paper discusses the quality control of double T board’s manufacture,transportation and hoisting.
作者 张大洪 ZHANG Dahong(Sinograin Lianyungang Reserve Depot Co.,Ltd.,Lianyungang 222000,China)
出处 《现代食品》 2022年第24期44-48,共5页 Modern Food
关键词 方案比较 双T板 制作 运输 吊装 program comparison double T board manufacture transportation hoisting
  • 相关文献

参考文献1

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部