文章结合融水三桥项目实例,对施工监测和施工控制实施方案进行分析,针对主桥、预应力筋、支座、伸缩缝等各类结构提出施工技术要点,以保证桥梁的施工质量,为连续刚构桥结构设计和施工质量控制积累了重要的工程经验。
Combining with the example of Rongshui Third Bridge project, this paper analyzes the implementation scheme of construction monitoring and construction control, and puts forward construction technical points for various structures such as main bridge, prestressed tendons, bearings, expansion joints, etc., so as to ensure the construction quality of bridges, and accumulate important engineering experience for structural design and construction quality control of continuous rigid frame bridges.