摘要
以无锡市妇幼保健院产科病房楼改造项目为例,对医院既有建筑改造的难点、要点和医疗流程再造等方面进行深入探讨,总结经验,可供医院投资方、建筑师和技术人员参考。
Taking the reconstruction project of the obstetric ward building of Wuxi maternal and child health hospital as an example,this paper makes an in-depth discussion on the difficulties,key points and medical process reengineering in the reconstruction of the existing buildings of the hospital,and summarizes the experience,which can be used as a reference for the investors,architects and technicians of the hospital.
出处
《中国医院建筑与装备》
2023年第1期13-17,共5页
Chinese Hospital Architecture & Equipment
关键词
既有建筑
流程再造
病房大楼
医院建设
Existing building
Process reengineering
Ward building
Hospital construction