摘要 徐州地铁5号线一期工程线路均为地下线,其中,最为复杂的穿越点为和平路站—骆驼山站区间穿越39股道铁路车辆段。论文结合工程实际情况,详细描述区间穿越铁路车辆段的设计方案,软弱土层、风险建构筑物加固方案,以及施工注意事项。 The lines of the first phase of Xuzhou Metro Line 5 are all underground lines,among which the most complicated crossing point is the 39th track of railway depot between Heping Road Station and Luotuoshan Station.Combined with the actual situation of the project,the paper describes in detail the design scheme for the section crossing the railway depot,the reinforcement scheme for the weak soil layer and risk buildings,and the construction precautions.
作者 娄小骏 LOU Xiao-jun(China Railway Fifth Survey and Design Institute Group,Beijing 100000,China)
出处 《工程建设与设计》 2022年第22期44-46,共3页 Construction & Design for Engineering
关键词 盾构区间 复杂地层 铁路车辆段 地层加固 shieldinterval complexstrata railwaydepot stratumreinforcement
  • 相关文献

参考文献1

二级参考文献3

共引文献1

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部