以斯里兰卡科伦坡Havelock City项目为例,对项目中采用的现浇后张法有黏结预应力施工工艺进行分析。介绍了施工准备工作,对项目施工过程中的具体工艺、施工中出现的问题及相应的解决措施进行详细阐述。
Taking the project of Havelock City commercial Development project in Colombo, Sri Lanka as an example, paper analyzes the construction technology of cast-in-place post-tensioning bonded prestressing in the project. This paper introduces the construction preparation work, and elaborates the specific technology in the construction process, the problems in the construction and the corresponding solutions in detail.
作者
郑斌
王娜
ZHENG Bin;WANG Na(China Harbour Engineering Co.Ltd.,Beijing 100027,China;Wuchang University of Technology,Wuhan 430000,China)
出处
《工程建设与设计》
2023年第1期179-182,共4页
Construction & Design for Engineering
关键词
分类预应力
后张法
有黏结
通病防治
classified prestress
post-tension method
bonded