摘要 为了解决直线加速器机房施工过程中的重难点,本文结合“平疫结合”大型医院的工程实例,从混凝土原材料设计、大体积混凝土早期温度场分析、大体积混凝土测温管控、BIM技术辅助高大支模、预留预埋深化设计等方面进行了详细分析,总结了相应的施工操作要点,从而保证了直线加速器机房的施工质量,可为类似工程提供借鉴。 In order to solve the difficulties in the construction of linear accelerator room,combined with the engineering example of“combination of normal condition with emergency”of a large hospital,a detailed analysis is conducted from the aspects of concrete raw material design,early temperature field analysis of mass concrete,temperature measurement and control of mass concrete,BIM technology-assisted high form erecting,reserved embedded deepening design,etc.,and the corresponding construction operation points are summarized,so as to ensure the construction quality of linear accelerator room and provide references for similar projects.
作者 刘丹 金国栋 杨钦 刘健 冯少凯 LIU Dan;JIN Guodong;YANG Qing;LIU Jian;FENG Shaokai(China Construction Eighth Engineering Division Co.,Ltd.,Shanghai 200120,China)
出处 《工程建设》 2023年第1期60-64,共5页 Engineering Construction
关键词 直线加速器机房 大体积混凝土 水化热 超高支模 BIM技术 linear accelerator room mass concrete hydration heat super-form erecting BIM technology
  • 相关文献

参考文献5

二级参考文献25

共引文献15

同被引文献17

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部