期刊文献+

Development of Subgrade Technical System for High-speed Railway

下载PDF
导出
摘要 There are two phases in the development of China's high-speed railway after the1990s:the research and experiment phase during the Eighth and the Tenth Five-Year Plan periods;the construction and operation phase during the Eleventh and the Thirteenth Five-Year Plan periods.This paper regards the Beijing-Shanghai High-Speed Railway as the corner stone in the development of high-speed railway subgrade system,and proposes suggestions and solutions to the problems which may reduce the service life of subgrade.These solutions and methods can be referred to in future railway projects.
作者 YOU Changlong
出处 《Chinese Railways》 2022年第2期20-33,共14页 中国铁路(英文版)
  • 相关文献

参考文献11

二级参考文献108

共引文献106

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部