马兰矿综采工作面过断层围岩综合控制技术 被引量:7

Comprehensive Control Technology of Surrounding Rock for Crossing Fault in Fully Mechanized Coal Face in Malan Colliery
下载PDF
导出
摘要 以马兰矿12702综采工作面为工程背景,分析了断层在工作面推进过程中的影响机理,探究了注浆加固技术和巷道加强支护技术对工作面过断层的实践。应用表明,工作面在推过断层期间,顶板应力集中不明显,巷道顶板下沉在可控范围内,工作面设备推进正常。 Taking 12702 fully mechanized coal face of Malan Colliery as the engineering background,this paper analyzes the influence mechanism of the fault in the process of advancing the working face,and explores the practice of grouting reinforcement technology and roadway strengthening support technology for crossing fault of the working face,whose application shows that the roof stress concentration is not obvious while crossing the fault,the roof subsidence of the roadway is within the controllable range,and the advance of the working face equipment is normal.
作者 朱瑞 Zhu Rui(Malan Colliery,Xishan Coal Power Group)
出处 《江西煤炭科技》 2023年第1期74-76,共3页 Jiangxi Coal Science & Technology
关键词 综采工作面 过断层 注浆加固 加强支护 fully mechanized coal face crossing fault grouting reinforcement strengthening support
  • 相关文献

参考文献6

二级参考文献26

共引文献74

同被引文献32

引证文献7

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部