期刊文献+

国际风电项目可行性研究报告编制的重点问题研究

Key Issues in Preparation of Feasibility Study Report for International Wind Power Projects
下载PDF
导出
摘要 可行性研究报告是国际项目融资、合约签订、投资决策的重要前置条件。由于国际项目的特殊性,对原始资料收集、数据分析、地质风险评估、投资编制、资源配置等方面的关注度较国内更为突出。以某国际风电项目可行性研究报告编制为例,重点对相关问题及采取的措施进行了分析,采用的属地化设计方法、创新运维方案具备参考价值高、实用性强,该可研报告已顺利通过项目履约各方的检验,项目风险可控、技术可行、安全可靠、费用合理可控、社会效益显著,为国家“一带一路”倡议的布局和“中国-中东欧合作机制”业务的开拓积累了技术经验,也为后期承接类似工程奠定了良好基础。 The feasibility study report is an important prerequisite for the financing, contract signing and investment decision of international projects. Taking the preparation of the feasibility study report of an international wind power project as an example, key issues of this work and corresponding countermeasures are analyzed. Due to the particularity of international projects, the attention on original information collection, data analysis, geological risk assessment, investment preparation, and resource allocation is more emphasized than domestic projects. The localized design method and the innovative operation and maintenance scheme adopted in this project is of high reference value and strong practicability. The prepared feasibility study report has successfully passed the examination of all participated parties. The project is of controllable risks, technical feasibility, good safety and reliability, reasonable and controllable cost, and significant social benefits. It has accumulated technical experience for the national “The Belt and Road Initiative” and the business development of the “Cooperation Mechanism between China and Central and Eastern European Countries”, and laid a good foundation for undertaking similar projects in the future.
作者 赵婉婷 ZHAO Wanting(Powerchina Chengdu Engineering Corporation,Chengdu 610072,China)
出处 《水电与新能源》 2023年第1期36-39,共4页 Hydropower and New Energy
关键词 国际风电 新能源 可行性研究 研究重点 一带一路 international wind power projects new energy feasibility study key issue The Belt and Road Initiative
  • 相关文献

参考文献5

二级参考文献21

  • 1阎石.数字电子技术基础[M].北京:高等教育出版社,1999..
  • 2International Energy Agency. World energy outlook 2009[OL].http://www.cwea.org.cn/upload/2009112300001.pdf,2009.
  • 3Navigant Research. A BTM wind report:world market update 2012[OL].http://Finance.yahoo.com/news/navigant-research-releases-btm-wind-090000970.html,2013.
  • 4BERTANI R. Geothermal power generation in the world 2005 ~ 2010 update report[J].GEOTHERMICS,2012,(01):1-29.
  • 5国家能源局.风电发展“十二五”规划.
  • 6Renewable Energy Policy Network for the 21st Century. Renewables 2012 global status report[OL].http://www.indiaenvironmentportal.org.in/content/356378/renewable-2012-global-status-report,2012.
  • 7International Energy Agency. Technology roadrnap:geothermal heat and power[OL].http:// www.environmentportal.in/content/330806/technology-roadmapsgeother-mal-heat-and-power,2011.
  • 8方笑菊.可再生能源管理将有"据”可依[N]中国能源报,2013.
  • 9潘松.VHDL实用教程[M].西安电子科技大学出版社,2008.
  • 10]高曙光.可编程逻辑器件原理、开发与应用[M].西安电子科技大学出版社.2002.

共引文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部