期刊文献+

BIM在沙颍河特大桥施工中的应用 被引量:1

BIM Application in Construction of Shaying River Bridge
下载PDF
导出
摘要 沙颍河特大桥工程是G106淮阳刘楼至项城李庄段改扩建工程中重要的组成部分。项目跨度大,涵盖复杂水文条件,且桥型广、工程结构复杂,施工同时必须考虑现场环境和生态环保因素,造成施工难度较大。以绿色施工理念为基础,通过全要素施工BIM应用实现了设计深化、施工管理、智慧工地等全流程整体优化,显著缩短了整体工期,节约了工程造价,提升了工程质量并为行业BIM发展积累了丰富经验。 Shaying River Bridge Project is an essential section of the G106 Huaiyang Liulou to Xiangcheng Lizhuang construction project.Difficulty in this project results from its large span with complex hydrological conditions,and the bridge type is wide with a complex structure design.Besides,construction must consider the factors of site surrounding and ecological environmental protection.Therefore,the BIM technology with the concept of green is introduced,BIM-based construction of all elements and objects implements the overall optimization of construction management,progress management,quality management,and material management,which significantly shortens the overall construction period,saves the cost,improves the quality of the project,and contributes the scheme eventually.
作者 吴明义 操文磊 WU Mingyi;CAO Wenlei(CCCC First Highway Engineering Group Co.,Ltd.,Beijing 100020,China)
出处 《施工技术(中英文)》 CAS 2023年第2期52-55,107,共5页 Construction Technology
基金 中交一公局集团有限公司课题:沙颍河五矮塔斜拉桥施工关键技术研究(KJYF-2021-C-05)。
关键词 桥梁工程 建筑信息模型 智慧工地 绿色施工 bridges building information modeling(BIM) smart site green construction
  • 相关文献

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部