深中通道沉管隧道工程技术难点及创新 被引量:2

Engineering Difficulties and Innovation of Immersed Tunnel of Shenzhen-Zhongshan Passage
原文传递
导出
摘要 深中通道是国内继港珠澳大桥后又一条世界级“桥、岛、隧、地下互通”的集群工程。该工程建设条件复杂,沉管管节结构超宽、超长、埋深超深,给工程设计和施工带来极大的挑战。设计中创造性提出采用钢壳混凝土组合结构方案,以解决结构受力难题,降低工程风险。这也是目前世界上首例采用钢壳混凝土组合结构建设的双向8车道沉管法隧道。就深中通道沉管法隧道在设计和施工中的关键技术进行介绍和分析,以供今后类似工程借鉴。 Shenzhen-Zhongshan Passage is another world-class project composed of"bridge,island,tunnel and underground interchange"after the Hong Kong-Zhuhai-Macao Bridge Project in China.The complex construction condition,extra wide and long immersed element and extra deep embedment bring great challenges to the engineering design and construction.In order to deal with the structural stress and reduce the engineering risk,the steel-concrete sandwich structure is proposed for the immersed element creatively.This is the world’s first bi-directional 8-lane immersed tunnel built with steel-concrete sandwich structure.The key technologies in the design and construction of the immersed tunnel are introduced and analyzed,which can be referred for the similar projects in the future.
作者 陈鸿 贺春宁 曾毅 Chen Hong;He Chunning;Zeng Yi
出处 《隧道与轨道交通》 2022年第4期1-7,65,共8页 Tunnel and Rail Transit
  • 相关文献

同被引文献30

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部