摘要
为保证厂房类项目地坪的施工质量,通过将变形缝与金刚砂地坪进行协调一体化施工,达到一次成优,避免传统依次施工时地坪与变形缝处接缝不顺直、标高不统一等质量问题。总结了一体化施工技术的关键工艺,最终取得了较好的实施效果。
In order to ensure the construction quality of the floor of the factory building project,the deformation joint and the carborundum floor are coordinated and integrated to achieve one-time completion,and avoid the quality problems such as the joint between the floor and the deformation joint is not straight and the elevation is not uniform during the traditional sequential construction.The key process of integrated construction technology is summarized,and good implementation effect is finally achieved.
作者
胡文强
杨健
陈孟瑶
冉杰
HU Wenqiang;YANG Jian;CHEN Mengyao;RAN Jie(China Construction Fifth Engineering Bureau The Third Construction Co.,Ltd.,Changsha 410004,Hunan,China)
出处
《建筑施工》
2023年第1期64-66,共3页
Building Construction
关键词
承重型楼面
变形缝
金刚砂地坪
一体化施工
load-bearing floor
deformation joint
carborundum floor
integrated construction