期刊文献+

地下车辆基地综合管线设计探讨

Study on Comprehensive Pipeline Design for Underground-Depot
下载PDF
导出
摘要 基于当车辆基地置于地下时,车辆基地内综合管线沟槽或支吊架与地下室底板层、顶板层结构构件密切相关,给整体设计带来较大困难这一问题,论文对地下车辆基地综合管线设计进行探讨,着重提出底板层管线沟槽设计关键技术、顶板层综合管线设置方案、盖上物业管线设计思路及项目实施过程中注意事项。 Based on the problem that when the depot is placed underground with property development,the grooves or the support hangers is closely related to the structural components of floor and roof,which brings great difficulties to the design and construction,this paper discusses the design of integrated pipeline of under-ground depot.The key technology of pipeline groove in floor,the scheme of pipeline installation in roof,the design idea of pipeline for up-property and the matters needing attention in the project implementation are emphatically put forward.
作者 王姝 陈辉 WANG Shu;CHEN Hui(China Railway Shanghai Design Institute Group Co.Ltd.,Shanghai 200070,China;Shanghai Highway&Bridge Group,Shanghai 200085,China)
出处 《工程建设与设计》 2023年第3期58-61,共4页 Construction & Design for Engineering
关键词 地下车辆基地带物业开发 综合管线布局 关键技术 应对策略 property development on underground-depot comprehensive pipeline layout key technology coping strategies
  • 相关文献

参考文献7

二级参考文献33

共引文献46

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部