浅谈汽车工厂涂装车间设备交割前期验证策划

Brief Discussion on Preliminary Verification Planning of Equipment Delivery in Painting Workshop of Automobile Factory
下载PDF
导出
摘要 通过设备交割前期验证策划,包括设备交割改造工艺策划、设备交割改造方向、设备交割改造验证方法和设备交割验证注意事项等,能快速识别交割设备存在问题,制定改造方案,最终实现工艺策划SOP目标。 Throughtheequipment delivery prevalidation planning,including equipment delivery transformation process planning,eequipmentdeliverytransformation direction,equipment delivery transformation verification method and equipment delivery verification precautions,delivery equipment problems was quickly identified,transformation plan was developed,and finally the process planning SOP objectives were achieved.
作者 李志杰 刘铁锁 张腾飞 郭志强 李玉鹏 马少乾 谢世雄 王浩 文超群 LI Zhi-jie;LIU Tie-suo;ZHANG Teng-fei;GUO Zhi-qiang;LI Yu-peng;MA Shao-qian;XIE Shi-xiong;WANG Hao;WEN Chao-qun(Great Wall Motor Co.,Ltd.,Hebei Automotive Engineering and Technology Research Center,Baoding 071000,Hebei,China)
出处 《现代涂料与涂装》 CAS 2023年第1期34-36,共3页 Modern Paint & Finishing
关键词 设备交割 静态验证 动态验证 equipment delivery static verification dynamic verification
  • 相关文献

参考文献3

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部