整体预制叠合梁设计及关键技术研究 被引量:1

Design of Integral Precast Composite Beam and Study of Key Technology
下载PDF
导出
摘要 杭州市莫干山路高架桥采用全预制拼装工艺设计及施工,其上部结构主要采用多跨连续整体预制叠合梁。以该项目为研究对象,对莫干山路高架桥整体预制叠合梁工艺进行介绍,探讨其具体的设计内容。并针对该项目特殊性,对整体预制叠合梁负弯矩区处理方案进行比选,以期为类似情况项目的设计及施工提供一定参考。 The viaduct in Moganshan Road of Hangzhou is designed and constructed by the full prefabrication and assembly technology. Its superstructure is mainly the multi-span continuous integral precast composite beam. Taking this project as the research object, the technology of integral precast composite beam for the viaduct in Moganshan Road is introduced, and its detailed design contents are discussed.According to the particularity of the project, the treatment schemes of the negative moment area of the integral precast composite beam are compared and selected in order to provide some reference for the design and construction of the similar projects.
作者 魏一绗 师发明 邓佳承 WEI Yihang;SHI Faming;DENG Jiacheng
出处 《城市道桥与防洪》 2023年第2期63-65,共3页 Urban Roads Bridges & Flood Control
关键词 全预制拼装 整体预制叠合梁 有限元计算 设计 施工 full prefabrication and assembly integral precast composite beam finite element calculation design construction
  • 相关文献

参考文献4

二级参考文献19

共引文献63

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部