期刊文献+

组合梁斜拉桥的合理成桥索力计算方法研究

Research on the Determination Method of Reasonable Finished Cable Force of Composite Beam Cable-stayed Bridge
下载PDF
导出
摘要 确定斜拉桥合理成桥状态下的索力是设计和计算分析的关键,以赤壁长江公路大桥为工程背景,对零位移法和不同设置参数下的最小弯曲能量法的电算结果进行分析和比较,探究适合组合梁斜拉桥合理成桥索力的初步确定方法。结果表明:最小弯曲能量法使塔梁抗弯惯性矩lyy缩小10 000倍的参数来计算,得到的合理成桥状态方案最优。 It is the key to determine the cable force of a cable-stayed bridge under reasonable completion condition.Taking a Yangtze River Highway Bridge as the engineering background, this paper analyzes and compares the results of the zero displacement method and the minimum bending energy method under different setting parameters to explore the preliminary determination method suitable for the reasonable completion cable force of the composite girder cable-stayed bridge.The results show that the minimum bending energy method reduces the bending inertia moment lyy of the tower girder by 10000 times, and the reasonable finished dead state is optimal.
作者 戴明禹 DAI Ming-yu(Wuxi Metro Construction Co.,Ltd.,Wuxi,Jiangsu 214000,China)
出处 《黑龙江交通科技》 2023年第1期64-66,共3页 Communications Science and Technology Heilongjiang
关键词 组合梁斜拉桥 合理成桥状态 成桥索力优化 composite beam cable-stayed bridge reasonable finished dead state cable force optimization
  • 相关文献

参考文献3

二级参考文献9

共引文献85

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部